I-80 Vallejo Six Bridges Project - Public Information Meeting

Date: 
07/29/2020
Caltrans has scheduled to begin work on increasing the vertical clearance on six bridges that cross over Interstate 80 (I-80) in the City of Vallejo just north of the Carquinez Bridge.
 
The bridges are on I-80 in this order going north:
  • Magazine Street

  • Benicia Road

  • Georgia Street

  • Springs Road

  • Tennessee Street

  • Redwood Street

 
The six bridges do not meet the current vertical clearance design standard of 16 feet 6 inches. Caltrans will increase the vertical clearance at each bridge one at a time, starting with Springs Road. The work will take about four months per bridge. A complete 4-month closure of Springs Road at I-80 is anticipated to start sometime in late Fall 2020.
 
For more information about this project:
OR
Contact Caltrans Public Information Officer
PEDRO QUINTANA
Phone: (510) 286-5620
 

Public Meeting:

July 29, 2020/STARTS AT 4:30 VIA ZOOM
 
TO JOIN THE MEETING VIA ZOOM
1. Download the ZOOM app to your computer or
mobile device
2. Join the meeting by clicking on the link below
3. Call the number listed below and enter the Meeting Link - https://zoom.us/join Meeting ID: 914-0075-0676 (Name an email address would be required to join meeting).
 
TO JOIN THE MEETING BY PHONE
Call: (669)900-6833
Enter Code: 91400750676#
Press # Again to join the webinar.
 
To digitally raise your hand from your phone: Press *9