Measure T Projects

Start Year: 2018
Project # Start Yearsort descending Municipality Road Name Project Description Total Project Cost Measure T Cost Estimate Other Funds Est. Start Date Est. Completion Date
19535 2018 City of St. Helena El Bonita Ave

Curb Ramps, 2" AC Overlay with Fabric, Striping on El Bonita Ave from La Quinta Way to change of pavement

$30,844 $6,592 $24,252 Jul 2018 Feb 2019
19536 2018 City of St. Helena El Bonita Ave

Curb Ramps, 2.5" AC Overlay with Fabric, Striping on El Bonita Ave from change of pavement to Dahlia St

$22,207 $4,746 $17,461 Jul 2018 Feb 2019
19537 2018 City of St. Helena El Bonita Ave

Curb Ramps, 2.5" AC Overlay with Fabric, Striping on El Bonita Ave from Dahlia St to Main St

$219,490 $46,908 $172,582 Jul 2018 Feb 2019
19538 2018 City of St. Helena El Bonita Cir

Curb Ramps, 2.5" AC Overlay with Fabric, Striping on El Bonita Cir from El Bonita Ave to end of El Bonita Cir

$51,800 $11,070 $40,730 Jul 2018 Feb 2019
19539 2018 City of St. Helena Kennedy Ct

Curb Ramps, 2.5" AC Overlay with Fabric, Striping on Kennedy Ct from La Quinta Way to end of Kennedy Ct

$80,197 $17,139 $63,058 Jul 2018 Feb 2019
19540 2018 City of St. Helena La Quinta Way

Curb Ramps, 2.5" AC Overlay with Fabric, Striping on La Quinta Way from Dahlia St to end of La Quinta Way

$74,028 $15,821 $58,207 Jul 2018 Feb 2019
19501 2018 City of Napa Trower Ave Phase 1

Cold-In-Place Pavement Recycling and Curb Ramps from SR-29 to Jefferson St

$1,458,785 $1,458,785 0 Jul 2018 Jan 2019
19502 2018 City of Napa Trower Ave Phase 1

Curb, Gutter, Ramp and Sidewalk Concrete Repair on Trower Ave from Dry Creek Rd to Linda Vista Ave

$422,133 $422,133 0 Jul 2018 Jan 2019
19503 2018 City of Napa Westwood Neighborhood Phase1

Curb, Gutter, Ramps, Sidewalks and Hot Mix Asphalt Overlay on Kilburn Ave from Cornwall Ave to Laurel St , on Chelsea Ave from Kilburn Ave to First St and Bryan Ave from Kilburn Ave to Laurel St

$2,934,236 $2,934,236 0 Jul 2018 Feb 2019
19519 2018 City of Calistoga Cedar St - Washington St - Grant St

Design for Cedar St from Spring St to Lincoln Ave;   Design for Washington St from Berry St to Lincoln Ave;   Design for Grant St from Garnett Creek Ct to Greenwood Ave

$146,159 $82,973 $63,186 Jul 2018 Dec 2019
Start Year: 2019
Project # Start Yearsort descending Municipality Road Name Project Description Total Project Cost Measure T Cost Estimate Other Funds Est. Start Date Est. Completion Date
19558 2019 City of St. Helena Park St

Overlay on Park St from Christine Ct to Crinella Dr

$42,483 $39,011 $3,472 Mar 2019 Sep 2020
19530 2019 City of American Canyon Park Ln

Mill and Overlay on Park Ln from Knightsbridge Way to end of Park Ln

$17,864 $17,864 0 Jun 2019 Jun 2020
19518 2019 Napa County Ridgecrest Dr

Storm Damage Repair and Road Reconstruction on section of Ridgecrest Dr (Circle Oaks)

$1,271,803 $1,017,657 $254,146 Jul 2019 Oct 2020
19559 2019 City of St. Helena Christine Ct

Overlay on Christine Ct from Park St to end of Christine Ct E

$20,048 $18,410 $1,638 Mar 2019 Sep 2020
19531 2019 City of American Canyon Regent Ct

Mill and Overlay on Regent Ct from Knightsbridge Way to end of Regent Ct

$21,383 $21,383 0 Jun 2019 Jun 2020
19575 2019 Napa County Berryessa Knoxville Rd at MPM 20.5-22

Storm Damage Repair and Road Reconstruction on Berryessa Knoxville Rd to 25' Bridge Span at mile-post-marker 20.5 to mile-post-marker 22

$201,314 $130,700 $70,614 Feb 2019 Dec 2020
19560 2019 City of St. Helena Henry Ct

19560Overlay on Henry Ct from Park St to end on Henry Ct E

$11,456 $10,520 $936 Mar 2019 Sep 2020
19532 2019 City of American Canyon Strand Ct

Mill and Overlay on Strand Ct from Knightsbridge Way to end of Strand Ct

$17,864 $17,864 0 Jun 2019 Jun 2020
19576 2019 Napa County Dry Creek Rd at MPM 7.75

Storm Damage Repair and Road Reconstruction on Dry Creek Rd at mile-post-marker 7.75

$141,665 $100,550 $41,115 Feb 2019 Aug 2020
19561 2019 City of St. Helena Spring St

38.492062Overlay on Spring St from Sylvaner Ave W to Chardonnay Way

$162,629 $149,339 $13,290 Mar 2019 Oct 2020
19533 2019 City of American Canyon James Rd

Road Reconstruction including pedestrian and bicycle improvements on James Rd from Crawford Way to Donaldson Way W

$317,958 $317,958 0 Jun 2019 Jun 2020
19577 2019 Napa County Dry Creek Rd at MPM 10.5

Storm Damage Repair and Road Reconstruction on Dry Creek Rd at mile-post-marker 10.5

$139,952 $98,250 $41,702 Feb 2019 Aug 2020
19579 2019 Napa County Mt Veeder Rd at MPM 4.75

Storm Damage Repair and Road Reconstruction on Mt Veeder Rd at mile-post-marker 4.75

$182,517 $129,300 $53,217 Feb 2019 Aug 2020
19562 2019 City of St. Helena Spring St

Overlay on Spring St from 639' west of Sylvaner Ave to Sylvaner Ave

$61,844 $56,790 $5,054 Mar 2019 Oct 2020
19534 2019 City of American Canyon James Rd

Road Reconstruction including pedestrian and bicycle improvements on James Rd from W American Canyon Rd to Crawford Way

$325,522 $325,522 0 Jun 2019 Jun 2020
19578 2019 Napa County Dry Creek Rd at MPM 10.75

Storm Damage Repair and Road Reconstruction on Dry Creek Rd at mile-post-marker 10.75

$182,517 $129,300 $182,517 Feb 2019 Oct 2021
19580 2019 Napa County Dry Creek Rd at MPM 7.51

Storm Damage Repair and Road Reconstruction on Dry Creek Rd at mile-post-marker 7.51

$159,231 $116,300 $42,931 Feb 2019 Aug 2020
19563 2019 City of St. Helena Kearney St

Overlay on Kearney St from Pine St to Adams St

$56,324 $51,721 $4,603 Mar 2019 Sep 2020
19581 2019 Napa County Mt Veeder Rd at MPM 4.0

Storm Damage Repair and Road Reconstruction on Mt Veeder Rd at mile-post-marker 4.0

$154,363 $133,150 $21,213 Feb 2019 Oct 2021
19564 2019 City of St. Helena Arrowhead Dr

Overlay on Arrowhead Dr from Sulphur Springs Ave to end of Arrowhead Dr S

$79,210 $72,737 $6,473 Mar 2019 Oct 2020
19582 2019 Napa County Mt Veeder Rd at MPM 5.1

Storm Damage Repair and Road Reconstruction on Mt Veeder Rd at mile-post-marker 5.1

$156,641 $134,300 $22,341 Feb 2019 Oct 2021
19565 2019 City of St. Helena McCorkle Ave

Overlay on McCorkle Ave from Allison Ave to end of McCorkle Ave W

$17,542 $16,109 $$1,433 Mar 2019 Oct 2020
19566 2019 City of St. Helena Church St

Overlay on Church St from Hunt Ave to Pope St

$40,322 $37,027 $3,295 Mar 2019 Oct 2020
19551 2019 City of St. Helena Volker Ct

Overlay on Volker Ct from Crinella Dr to end of Volker Ct E

$20,048 $18,410 $1,638 Mar 2019 Sep 2020
19567 2019 City of St. Helena Hudson Ave

Overlay on Hudson Ave from Madrona Ave to Adams St

$58,530 $53,747 $4,783 Mar 2019 Oct 2020
19504 2019 Town of Yountville Yount St

Road Reconstruction and Micro Surface on Yount St from Mount Ave to Finnell Rd

$368,293 $368,293 0 Apr 2019 Jun 2019
19568 2019 City of St. Helena Hudson Ave

Overlay on Hudson Ave from Adams St to Spring St

$62,308 $57,216 $5,092 Mar 2019 Oct 2020
19516 2019 Town of Yountville Yount St

Overlay on Yount St from Finnell Rd to Washington St

$85,569 $85,569 0 Apr 2019 Jun 2019
19569 2019 City of St. Helena Money Way

Overlay on Money Way from Adams St to Spring St

$35,081 $32,214 $2,867 Mar 2019 Oct 2020
19541 2019 City of St. Helena Andrea Ave

Curb Ramps, 2" AC Overlay with Fabric, Striping on Andrea Ave from Kearney St to Oak Ave

$39,141 $35,942 $3,199 Mar 2019 Sep 2020
19504.1 2019 Town of Yountville Yount St storm drain 40'

Reconstruct storm drain 40' at 6654 Yount St

$11,036 $11,036 0 Feb 2019 Feb 2019
19570 2019 City of St. Helena Paulson Ct

Overlay on Paulson Ct from Pope St to end of Paulson Ct N

$31,070 $28,531 $2,539 Mar 2019 Oct 2020
19542 2019 City of St. Helena Grove Ct

Curb Ramps, 2" AC Overlay with Fabric, Striping on Grove Ct from Hunt Ave to end of Grove Ct N

$152,548 $140,061 $12,467 Mar 2019 Oct 2019
19543 2019 City of St. Helena Kearney St

Curb Ramps, 2" AC Overlay with Fabric, Striping on Kearney St from Hillview Pl to Madrona St

$51,551 $47,338 $4,213 Mar 2019 Sep 2020
19544 2019 City of St. Helena Kearney St

Curb Ramps, 2" AC Overlay with Fabric, Striping on Kearney St from Madrona Ave to Pine St

$35,323 $32,436 $42,887 Mar 2019 Sep 2020
19545 2019 City of St. Helena Spring St

Curb Ramps, 2" AC Overlay with Fabric, Striping on Spring St from Chardonnay Way to Sylvaner Ave E
 

$215,080 $197501 $17,578 Mar 2019 Oct 2020
19546 2019 City of St. Helena Spring St

Curb Ramps, 2" AC Overlay with Fabric, Striping on Spring St from Sylvaner Ave to Valley View St

$129,164 $118,608 $10,556 Mar 2019 Oct 2020
19547 2019 City of St. Helena Spring St

Curb Ramps, 2" AC Overlay, Striping on Spring St from City Limits to 639' W/O Sylvaner Ave

$125,231 $114,996 $10,235 Mar 2019 Oct 2020
20503 2019 Town of Yountville Microsurface treatment Mulberry St area & Adams St area

Microsurfacing treatment to Mulberry St, Heather St, Holly St and Larkspur St.   Microsurfacing treatment to Adams St, Jefferson St, Lande Way, Pedroni St and Stags View Ln

$157,249 $157,249 0 Oct 2019 Nov 2019
19548 2019 City of St. Helena Monte Vista Ave

Curb Ramps, 2.5" AC Overlay with Fabric, Striping on Monte Vista Ave from Hunt Ave to end of Monte Vista Ave N

$158,577 $145,618 $12,959 Mar 2019 Oct 2020
19583 2019 City of Calistoga Spring St

Road rehabilitation on Spring St from Cedar St to end

$244,113 $203,819 $40,294 Oct 2018 Aug 2019
19549 2019 City of St. Helena Hwy29 / Main St

Concrete work on Hwy29 aka Main St from Mitchell Dr to Pine St

$1,862,500 $175,000 $1,687,500 Feb 2019 Jun 2021
19505 2019 Napa County Coronado Ave

Road Reconstruction and Overlay on Coronado Ave (up to Napa City limit)

$93,012 $93,012 0 Jul 2019 Oct 2019
19550 2019 City of St. Helena Hunt Ave

Curb Gutter and Ramps, Sidewalks on Hunt Ave from June Ln to Monte Vista Ave

$306,980 $231,980 $75,000 Jan 2019 Mar 2020
19506 2019 Napa County London Way

Road Reconstruction and Overlay on London Way from Coronado Ave to Napa City limit

$395,299 $395,299 0 Jul 2019 Oct 2019
19572 2019 City of Napa Trancas St Phase 1

HMA Overlay, Curb, Gutter, Sidewalk and Curb Ramps, Traffic Signals on Trancas St from Hwy 29 to Jefferson St

$1,500,000 $1,500,000 0 Jul 2019 Nov 2019
19520 2019 City of American Canyon American Canyon Rd

Overlay on American Canyon Rd from East of SR-29 to Bridge

$148,842 $148,842 0 Jun 2019 Oct 2019
19507 2019 Napa County Republic Ave

Road Reconstruction and Overlay on Republic Ave from Coronado Av to Napa City limit

$116,265 $116,265 0 Jul 2019 Oct 2019
19571 2019 City of Napa Westwood Neighborhood Phase 2A


Hot Mix Asphalt Grind and Overlay with Concrete Work in the Westwood Neighborhood.  Project continues with redesign for Phases 2A, 2B, 2C and 2D over a multi-year schedule

$2,000,000 $2,000,000 0 TBD TBD
19521 2019 City of American Canyon American Canyon Rd

Mill and Overlay on American Canyon Road E from Bridge to Flosden Intersection

$427,918 $427,918 0 Jun 2019 Oct 2019
19508 2019 Napa County Holmes Ave

Road Reconstruction and Overlay on Holmes Ave from 124 Holmes Ave to Shetler Ave (up to Napa City limit)

$162,770 $162,770 0 Jul 2019 Oct 2019
19574 2019 City of Napa Lincoln Ave & Main St

Traffic Signals and Interconnect at Lincoln Ave and Main St Intersection

$600,000 $600,000 0 Jul 2019 Feb 2020
19522 2019 City of American Canyon American Canyon Rd

Mill and Overlay on American Canyon Rd from East of Bridge to Flosden Intersection
 

$43,412 $43,412 0 Jun 2019 Oct 2019
19509 2019 Napa County Shetler Ave

Road Reconstruction and Overlay on Shetler Ave from 1082 Shetler Ave to 1090 Shetler Ave (up to Napa City limit)

$139,517 $139,517 0 Jul 2019 Oct 2019
19573 2019 City of Napa Trower Ave Phase 2

Hot Mix Asphalt Grind and Overlay and Concrete Improvements on Trower Ave from Dry Creek Rd to Linda Vista Ave;  Hot Mix Asphalt Grind and Overlay with Concrete Curbs, Gutters, Sidewalks and Curb Ramps on Trower Ave from Jefferson St to East End (City Limits)
 

$1,858,291 $1,858,291 0 Jul 2019 Nov 2019
19523 2019 City of American Canyon Arden Ct

Mill and Overlay on Arden Ct from Knightsbridge Way to end of Arden Ct

$17,864 $17,864 0 Jun 2019 Apr 2020
19510 2019 Napa County Shetler Ave

Road Reconstruction and Overlay on Shetler Ave from 1138 Shetler Ave to 1161 Shetler Ave (up to Napa City limit)

$209,276 $209,276 0 Jul 2019 Oct 2019
19552 2019 City of St. Helena Vorhees Cir

Overlay on Vorhees Cir from Mitchell Dr E to Mitchell Dr W

$87,351 $80,212 $7,139 Mar 2019 Sep 2020
19524 2019 City of American Canyon Chaucer Ln

Mill and Overlay on Chaucer Ln from American Canyon Rd to Benton Way

$190,094 0 $190,094 Jun 2019 Oct 2019
19511 2019 Napa County Whitney Ave

Road Reconstruction and Overlay on Whitney Ave from Coronado Ave to Marshall Ave

$162,770 $162,770 0 Jul 2019 Oct 2019
19553 2019 City of St. Helena Brown St

Overlay on Brown St from Allison Ave to end of Brown St W

$46,779 $42,956 $3,823 Mar 2019 Sep 2020
19525 2019 City of American Canyon Kensington Way

Mill and Overlay on Kensington Way from Chaucer Ln to the east end of Kensington Way

$57,234 0 $57,234 Jun 2019 Oct 2019
19512 2019 Napa County Marshall Ave

Road Reconstruction and Overlay on Marshall Ave from 2172 Marshall Ave to Imola Ave (up to Napa City limit)

$139,517 $139,517 0 Jul 2019 Oct 2019
19554 2019 City of St. Helena Crinella Ct

Overlay on Crinella Ct from Main St to Park St

$32,459 $29,806 $2,653 Mar 2019 Sep 2020
19526 2019 City of American Canyon Knightsbridge Way

Mill and Overlay on Knightsbridge Way from Elliott Dr to Danrose Dr

$99,638 $99,638 0 Jun 2019 Jun 2020
19513 2019 Napa County Parrish Rd

Road Reconstruction and Overlay on Parrish Rd from Shetler Ave to Imola Ave

$232,529 $232,529 0 Jul 2019 Oct 2019
19555 2019 City of St. Helena Crinella Dr

Overlay on Crinella Dr from Park St to the pump station

$73,985 $67,939 $6,046 Mar 2019 Sep 2020
19527 2019 City of American Canyon Lansford Ct

Mill and Overlay on Lansford Ct from Knightsbridge Way to end of Lansford Ct

$21,450 $21,450 0 Jun 2019 Jun 2020
19514 2019 Napa County Mayfair Dr

Road Reconstruction and Overlay on Mayfair Dr from London Way to Shetler Ave

$209,276 $209,276 0 Jul 2019 Oct 2019
XXXXX 2019 City of St. Helena Crinella Dr

Overlay on Crinella Dr from Park St to the pump station

Mar 2019 Sep 2020
19556 2019 City of St. Helena Crinella Dr

Overlay on Crinella Dr from the pump station to Park St

$70,645 $64,872 $5,773 Mar 2019 Sep 2020
19528 2019 City of American Canyon Linwood Ln

Mill and Overlay on Linwood Ln from Knightsbridge Way to end of Linwood Ln

$17,864 $17,864 0 Jun 2019 Jun 2020
19515 2019 Napa County Penny Ln

Road Reconstruction and Overlay on Penny Ln from Imola Ave to end of Penny Ln

$465,058 $465,058 0 Jul 2019 Oct 2019
19557 2019 City of St. Helena Park St

Overlay on Park St from Pratt Ave to Crinella Dr

$53,270 $48,916 $4,354 Mar 2019 Sep 2020
19529 2019 City of American Canyon Northampton Dr

Mill and Overlay on Northampton Dr from Elliott Dr to Danrose Dr

$134,365 $134,365 0 Jun 2019 Jun 2020
19517 2019 Napa County Sunnyhill Dr

Storm Damage Repair and Road Reconstruction on section of Sunnyhill Dr (Circle Oaks)

$1,101,743 $778,150 $323,593 Jul 2019 Oct 2020
Start Year: 2020
Project # Start Yearsort descending Municipality Road Name Project Description Total Project Cost Measure T Cost Estimate Other Funds Est. Start Date Est. Completion Date
20702 2020 Napa County Devlin Rd

New Road and Bridge Construction on Devlin Rd between Tower Rd and Airpark Rd with Class I facilities.   Funding: Airport Industrial Area Traffic Mitigation Fees.
 

$1,200,000 0 $1,200,000 Apr 2019 Feb 2020 - Class 1 Facility Tracking
20501 2020 City of Napa ATMS - Jefferson St

Advanced Traffic Management System installed at several intersections on Jefferson St

$900,000 $900,000 0 Jan 2020 Mar 2020
20504 2020 City of Napa Soscol Ave

Overlay on Soscol Ave from Central Ave to La Homa Dr

$2,400,000 $2,400,000 0 Jun 2020 Nov 2020
20505 2020 City of Napa West Lincoln Ave

Concrete Work on West Lincoln Ave from Lone Oak Ave to Solano Ave

$433,000 $433,000 0 Jun 2020 Nov 2020
20506 2020 City of Napa Coombs St and __ S Coombs St

Concrete work on Coombs St and         S Coombs St from     5th St to West Imola Ave

$606,000 $606,000 0 Jun 2020 Nov 2020
20507 2020 City of Napa Laurel St Phase 1

Concrete work on Laurel St from First St to Griggs Ln

 

$2,000,000 $2,000,000 0 Jun 2020 Nov 2020